Selection of large projects

The experts of 8.2 have examined more than 15,000 single turbines in 14 years: commissioning assessment, end of warranty assessment, recurring assessments, damage analysis, blade inspections, video endoscopy, vibration analysis etc. No other consultant worldwide has assessed this amount of turbines. No reference list will be produced for these single turbines and small wind parks assessments.

 

Onshore

Project Services Remarks Year
Breeze III

Due Diligence, negotiation assisstance

An app. 400 MW bond portfolio 2006–2007
Breeze IV Due Diligence An app. 200 MW bond portfolio 2006–2007
Wind park, Germany Technical assessment 40 MW 2006
Several projects in Italy, Germany and the Netherlands
Project advisory, cost analysis, Due Diligence, technical assessments
 – 2007
Several wind parks in Germany Technical assessments App. 80 MW 2006–2008
Breeze III Portfolio supervision App. 300 MW in France and Germany 2007–2027
Wind park, Morrocco Technical assessment prior to sale of wind park
50 MW
2007
Wind park, Norway End of warranty assessment
40 MW
2007
Several wind parks in Germany
Technical assessment
42 Gamesa turbines
2007
Wind park, Spain
Endoscopy of 90 turbines
100 MW
2007
PWC56
Due Diligence of a new turbine
 – 2007–2008
FL 2500
Due Diligence of a new turbine
 – 2007
Turbine Due Diligence
Due Diligence of the Vensys technology, general technology advisory, especially blades  – 2007–2008
MTorres, Fuhrländer, Vensys
Due Diligence of turbines, negotiation assisstance
 – 2008
 Wind park, Morrocco
Full engineering services, park layout, electrical layout etc.
300 MW
 
2008–2009
 Wind park, Germany
 Due Diligence
180 MW portfolio
2008
Assessments in 2 wind parks in Texas and South Dakota, USA
End of warranty assessments, commissioning assessments, fire hazard check, compliance with standards
 – 2008
Wind park, France
Commissioning assessment
70 MW
2008–2009
Wind park, Italy Technical inspection, damage root cause analysis, construction and repair monitoring, blade inspection
62 x 2 MW turbines
2009
Wind park Turkey
Due Diligence
270 MW portfolio
2009
Wind park, Bulgaria
Due Diligence of 2 wind parks
40 MW
2009
Wind park, Germany
Due Diligence including financial modelling
170 MW
2009
Wind park Portfolio
Due Diligence of a portfolio of 6 wind parks

2009
Due Diligence of turbine prototypes
Inspection, document review, video/borescopic reports, blade inspections
 – 2009
Inspection of turbines
Inspection after some months of stand-still
4 x FL1250
2009
Wind park, Costa Rica
Commissioning assessment
49.5 MW 2009
Wind park, Egypt
Damage analysis
  2009
Wind park, Azerbaijan
Commissioning assessment
2 x V52
2009
Turbine and company Due Diligence
Due Diligence of the manufacturer Clipper and DeWind
 – 2009
V112 Turbine Due Diligence

2009
Wind parks in Croatia
Planning assisstance
142 MW
2009–2010
Wind park, Germany
Due Diligence
23 MW
2009
Wind park, Germany
Due Diligence
55 MW
2009–2010
Wind park in Romania
Negotiation maintenance contract
45 MW
2010
Wind park, Poland
Due Diligence
20 MW
2010
Wind park, Poland
Due Diligence
50 MW
 
Wind park Fantanele, Romania
Commissioning assessment of the whole wind park
139 x 2,5 MW turbines
2010
General elaboration of tender specification
 –  – 2010

 

 

Offshore

Project Project Remarks Year
Offshore wind park
Production Monitoring (TP’s) 367 MW 2011

Collision Analysis
Substation

200 MW
2011
Consulting Services
288 MW
2010–2011
Factory Inspections, Collision Analysis, Consulting Services 400 MW (offshore)
2011
Owner’s Engineer, Project Support

2011
Inspection of offshore WTG
1 x 2.3 MW turbine
2011
WTG evaluation

2011
Sample gearbox inspections
55 x 3 MW turbines
2010
Factory inspections and quality assurance
400 MW
2010–2012
Collision Analysis
288 MW 2010–2011
Negotiation preparation and assistance with turbine manufacturer,
288 MW
2010–2011
Negotiation input for quality assurance and factory inspections
288 MW
2010
Construction supervision and commissioning assessment of 5.0 MW turbines, lifecycle prognosis
400 MW
2010–2012
Quality Assurance for monopiles
367,2 MW
2010–2011
Update of the Due Diligence study
400 MW
2009
Offshore test field
Construction supervision and commissioning assessment of the first German offshore wind park
60 MW
2009–2010
Offshore wind park
Due Diligence
288 MW

Due Diligence of possible turbines for the project in the range of 3.6 – 5 MW

2009
Negotiation assistance with turbine manufacturer
55 x 3 MW turbines
2008–2009
QA/QC management for all offshore foundation structures
55 x 3 MW turbines
2008–2009
Due Diligence for the possible purchase of the project (executed), wind park to be built in 2010
400 MW
2008
Offshore wind park
Negotiation assisstance
400 MW
2008–2009
Turbine Due Diligence
Due Diligence of 3 potential offshore turbines

2008
Offshore wind park
Re-calculation of decommissioning costs
90 MW
2007
Offshore test field
Technical adviser, factory inspections, quality control
60 MW
2007–2009