Selection of large projects
The experts of 8.2 have examined more than 15,000 single turbines in 14 years: commissioning assessment, end of warranty assessment, recurring assessments, damage analysis, blade inspections, video endoscopy, vibration analysis etc. No other consultant worldwide has assessed this amount of turbines. No reference list will be produced for these single turbines and small wind parks assessments.
Onshore
| Project | Services | Remarks | Year |
|---|---|---|---|
| Breeze III |
Due Diligence, negotiation assisstance |
An app. 400 MW bond portfolio | 2006–2007 |
| Breeze IV | Due Diligence | An app. 200 MW bond portfolio | 2006–2007 |
| Wind park, Germany | Technical assessment | 40 MW | 2006 |
| Several projects in Italy, Germany and the Netherlands |
Project advisory, cost analysis, Due Diligence, technical assessments |
– | 2007 |
| Several wind parks in Germany | Technical assessments | App. 80 MW | 2006–2008 |
| Breeze III | Portfolio supervision | App. 300 MW in France and Germany | 2007–2027 |
| Wind park, Morrocco | Technical assessment prior to sale of wind park |
50 MW |
2007 |
| Wind park, Norway | End of warranty assessment |
40 MW |
2007 |
| Several wind parks in Germany |
Technical assessment |
42 Gamesa turbines |
2007 |
| Wind park, Spain |
Endoscopy of 90 turbines |
100 MW |
2007 |
| PWC56 |
Due Diligence of a new turbine |
– | 2007–2008 |
| FL 2500 |
Due Diligence of a new turbine |
– | 2007 |
| Turbine Due Diligence |
Due Diligence of the Vensys technology, general technology advisory, especially blades | – | 2007–2008 |
| MTorres, Fuhrländer, Vensys |
Due Diligence of turbines, negotiation assisstance |
– | 2008 |
| Wind park, Morrocco |
Full engineering services, park layout, electrical layout etc. |
300 MW |
2008–2009 |
| Wind park, Germany |
Due Diligence |
180 MW portfolio |
2008 |
| Assessments in 2 wind parks in Texas and South Dakota, USA |
End of warranty assessments, commissioning assessments, fire hazard check, compliance with standards |
– | 2008 |
| Wind park, France |
Commissioning assessment |
70 MW |
2008–2009 |
| Wind park, Italy | Technical inspection, damage root cause analysis, construction and repair monitoring, blade inspection |
62 x 2 MW turbines |
2009 |
| Wind park Turkey |
Due Diligence |
270 MW portfolio |
2009 |
| Wind park, Bulgaria |
Due Diligence of 2 wind parks |
40 MW |
2009 |
| Wind park, Germany |
Due Diligence including financial modelling |
170 MW |
2009 |
| Wind park Portfolio |
Due Diligence of a portfolio of 6 wind parks |
– |
2009 |
| Due Diligence of turbine prototypes |
Inspection, document review, video/borescopic reports, blade inspections |
– | 2009 |
| Inspection of turbines |
Inspection after some months of stand-still |
4 x FL1250 |
2009 |
| Wind park, Costa Rica |
Commissioning assessment |
49.5 MW | 2009 |
| Wind park, Egypt |
Damage analysis |
2009 | |
| Wind park, Azerbaijan |
Commissioning assessment |
2 x V52 |
2009 |
| Turbine and company Due Diligence |
Due Diligence of the manufacturer Clipper and DeWind |
– | 2009 |
| V112 | Turbine Due Diligence |
– |
2009 |
| Wind parks in Croatia |
Planning assisstance |
142 MW |
2009–2010 |
| Wind park, Germany |
Due Diligence |
23 MW |
2009 |
| Wind park, Germany |
Due Diligence |
55 MW |
2009–2010 |
| Wind park in Romania |
Negotiation maintenance contract |
45 MW |
2010 |
| Wind park, Poland |
Due Diligence |
20 MW |
2010 |
| Wind park, Poland |
Due Diligence |
50 MW |
|
| Wind park Fantanele, Romania |
Commissioning assessment of the whole wind park |
139 x 2,5 MW turbines |
2010 |
| General elaboration of tender specification |
– | – | 2010 |
Offshore
| Project | Project | Remarks | Year |
|---|---|---|---|
| Offshore wind park |
Production Monitoring (TP’s) | 367 MW | 2011 |
|
Collision Analysis |
200 MW |
2011 | |
| Consulting Services |
288 MW |
2010–2011 |
|
| Factory Inspections, Collision Analysis, Consulting Services | 400 MW (offshore) |
2011 | |
| Owner’s Engineer, Project Support |
– |
2011 | |
| Inspection of offshore WTG |
1 x 2.3 MW turbine |
2011 | |
| WTG evaluation |
– |
2011 | |
| Sample gearbox inspections |
55 x 3 MW turbines |
2010 | |
| Factory inspections and quality assurance |
400 MW |
2010–2012 | |
| Collision Analysis |
288 MW | 2010–2011 |
|
| Negotiation preparation and assistance with turbine manufacturer, |
288 MW |
2010–2011 |
|
| Negotiation input for quality assurance and factory inspections |
288 MW |
2010 | |
| Construction supervision and commissioning assessment of 5.0 MW turbines, lifecycle prognosis |
400 MW |
2010–2012 |
|
| Quality Assurance for monopiles |
367,2 MW |
2010–2011 |
|
| Update of the Due Diligence study |
400 MW |
2009 | |
| Offshore test field |
Construction supervision and commissioning assessment of the first German offshore wind park |
60 MW |
2009–2010 |
| Offshore wind park |
Due Diligence |
288 MW |
– |
| Due Diligence of possible turbines for the project in the range of 3.6 – 5 MW |
– |
2009 | |
| Negotiation assistance with turbine manufacturer |
55 x 3 MW turbines |
2008–2009 |
|
| QA/QC management for all offshore foundation structures |
55 x 3 MW turbines |
2008–2009 |
|
| Due Diligence for the possible purchase of the project (executed), wind park to be built in 2010 |
400 MW |
2008 | |
| Offshore wind park |
Negotiation assisstance |
400 MW |
2008–2009 |
| Turbine Due Diligence |
Due Diligence of 3 potential offshore turbines |
– |
2008 |
| Offshore wind park |
Re-calculation of decommissioning costs |
90 MW |
2007 |
| Offshore test field |
Technical adviser, factory inspections, quality control |
60 MW |
2007–2009 |