Selection of large projects

The experts of 8.2 have examined more than 15,000 single turbines in 15 years: commissioning assessment, end of warranty assessment, recurring assessments, damage analysis, blade inspections, video endoscopy, vibration analysis etc. No other consultant worldwide has assessed this amount of turbines. The reference list does not take into account single turbines and small wind parks assessments.

 

Onshore

Project Services Remarks Year

Germany/France

bond portfolio, 44 wind farms

Technical Due Diligence, negotiation assistance

350 MW 2006 -20077

Germany

bond portfolio, 16 wind farms
Technical Due Diligence 200 MW 2006–2007

Germany

1 wind farm
Technical assessment 40 MW 2006
Germany / Italy / Netherlands, several projects
Project advisory, cost analysis, Due Diligence, technical assessments
 – 2007
Several wind parks in Germany Technical assessments 80 MW 2006–2008
Germany/France, bond portfolio, 44 wind farms
Portfolio supervision 350 MW
2007–2027
Germany, several wind farms
Technical assessment
84 MW (Gamesa turbines)
2007
Marocco, 1 wind farm
Technical assessment prior to sale of wind farm
50 MW
2007
Norway, 1 wind farm
End of warranty inspection
40 MW
2007
Spain, 1 wind farm
Endoscopy of 90 turbines
100 MW
2007
Power Wind
Turbine Due Diligence of a new turbine
 – 2007–2008
Fuhrländer
Turbine Due Diligence of a new turbine  – 2007
Vensys
Turbine Due Diligence, general technology advisory, especially blades  – 2007–2008
Germany, bond portfolio, several wind farms
Technical Due Diligence
180 MW
2008
MTorres, Fuhrländer, Vensys
Due Diligence of turbines, negotiation assisstance

 -
2008
Marocco, 1 wind farm
 Full engineering services, farm layout, electrical layout etc.
300 MW
2008 - 2009
USA, 2 wind farms
End of warranty assessments, commissioning assessments, fire hazard check, compliance with standards
 – 2008
France, 1 wind farm
Commissioning assessment
70 MW
2008–2009
Germany, 1 wind farm
Technical Due Diligence including financial modelling
170 MW
2009
Germany, portfolio, 6 wind farms
Technical Due Diligence
-
2009
Germany, 1 wind farm
Technical Due Diligence
23 MW
2009
Germany, 1 wind farm
Technical Due Diligence
55 MW
2009 - 2010
Italy, 1 wind farm
Technical inspection, damage root cause analysis, construction and repair monitoring, blade inspection
124 MW
2009
Turkey, portfolio, several wind farms
Technical Due Diligence
 270 MW
2009
Bulgaria, 2 wind farms
Technical Due Diligence
40 MW
2009
Costa Rica, 1 wind farm
Commissioning assessment
49.5 MW 2009
Egypt, 1 wind farm
Damage analysis
 - 2009
Azerbaijan, 1 wind farm
Commissioning assessment
2 MW (2xV52)
2009
Croatia, several wind farms
Planning assisstance
 142 MW
2009 - 2010
Due Diligence of turbine prototypes
Inspection, document review, video/borescopic reports, blade inspections

2009
Turbine and company Due Diligence
Due Diligence of the manufacturer Clipper and DeWind
-
2009
Vestas
Turbine Due Diligence
-
2009
Germany, portfolio, 6 wind farms
Technical Due Diligence
55 MW
2010
Germany, portfolio, 3 wind farms
Technical Due Diligence
40 MW (15 x V90-2,0 MW, 3 x MM92-2,0 MW)
2010
Romania, 1 wind farm
Negotiation maintenance contract
45 MW
2010
Romania, 1 wind farm Commissioning assessment 348 MW (139 x GE-2.5 MW)
 2010
Romania, 1 wind farm
Construction Supervision
45 MW (15 x V90-3 MW)
2010
Poland, 1 wind farm
Technical Due Diligence
20 MW
2010
Poland, 1 wind farm Technical Due Diligence 50 MW 2010
France, 3 wind farms Construction supervision 35 MW (15 x E70-2,3 MW) 2010
Germany, 2 planned wind farms Technical Due Diligence 13,5 MW 2011
Germany, portfolio, 5 wind farms Technical Due Diligence 72,5 MW (18 x E66-1,8 MW, 20 x E70-2,0 MW) 2011
Germany, 1 wind farm Short Technical Due Diligence 17 MW (5 x REpower 3,4M104) 2011
Germany, portfolio, 3 wind farms Short Technical Due Diligence 50 MW (25 x V80-2,0 MW) 2011
Germany, 1 wind farm Construction supervision 12,5 MW (5 x N100-2,5 MW) 2011 - 2012
Romania, 1 wind farm Commissioning inspection 45 MW (15 x V90-3 MW) 2011
Kazakhstan, 1 wind farm General consulting services 45 MW 2011
Australia, 1 wind farm End of warranty inspection 70 MW (35 x E-70-2,0 MW) 2011
Romania, 1 wind farm End of warranty inspection 348 MW (139 x GE-2.5 MW) 2012
Poland, 1 wind farm Foundation assessments 48 MW (24 x V80) 2012
France, 1 wind farm Technical Due Diligence 16 MW (7 x E-70-2,3 MW) 2012
Italy, 1 wind farm Turbine inspections 18 MW (12 x S779 2012
Spain, 1 wind farm Technical Due Diligence 16 MW (9 x V90-1,8 MW) 2012
Greece, 1 wind farm Commissioning 29 MW (34 x V52-850 KW) 2012
South Africa, 1 wind farm Technical Evaluation of different turbine concepts - 2012

 

 

Offshore

Project Project Remarks Year
Offshore wind park
Production Monitoring (TP’s) 367 MW 2011

Collision Analysis
Substation

200 MW
2011
Consulting Services
288 MW
2010–2011
Factory Inspections, Collision Analysis, Consulting Services 400 MW (offshore)
2011
Owner’s Engineer, Project Support

2011
Inspection of offshore WTG
1 x 2.3 MW turbine
2011
WTG evaluation

2011
Sample gearbox inspections
55 x 3 MW turbines
2010
Factory inspections and quality assurance
400 MW
2010–2012
Collision Analysis
288 MW 2010–2011
Negotiation preparation and assistance with turbine manufacturer,
288 MW
2010–2011
Negotiation input for quality assurance and factory inspections
288 MW
2010
Construction supervision and commissioning assessment of 5.0 MW turbines, lifecycle prognosis
400 MW
2010–2012
Quality Assurance for monopiles
367,2 MW
2010–2011
Update of the Due Diligence study
400 MW
2009
Offshore test field
Construction supervision and commissioning assessment of the first German offshore wind park
60 MW
2009–2010
Offshore wind park
Due Diligence
288 MW

Due Diligence of possible turbines for the project in the range of 3.6 – 5 MW

2009
Negotiation assistance with turbine manufacturer
55 x 3 MW turbines
2008–2009
QA/QC management for all offshore foundation structures
55 x 3 MW turbines
2008–2009
Due Diligence for the possible purchase of the project (executed), wind park to be built in 2010
400 MW
2008
Offshore wind park
Negotiation assisstance
400 MW
2008–2009
Turbine Due Diligence
Due Diligence of 3 potential offshore turbines

2008
Offshore wind park
Re-calculation of decommissioning costs
90 MW
2007
Offshore test field
Technical adviser, factory inspections, quality control
60 MW
2007–2009